KERN

KARRIERE

NEWS

UNITS

EN

Successful commissioning push pickling line decoiler

Successful commissioning push pickling line decoiler

On December 19, the plant shut-down for the renewal of a decoiler on a push pickling line at customer site in Hagen-Hohenlimburg/Germany started. The mechanical work was carried out by C-Technik Maschinen- und Anlagenbau GmbH. The electrotechnical part including...
Hot-dip galvanizing line FBA 10 at thyssenkrupp Steel Europe

Hot-dip galvanizing line FBA 10 at thyssenkrupp Steel Europe

ANDRITZ AG has built the new, state-of-the-art FBA 10 hot-dip galvanizing line for strip steels on the site of the former Westfalenhütte steel mill in Dortmund. With this investment, the operator, thyssenkrupp Steel Europe AG, is strengthening the site and at the same...
KERN supplies protective fence for new logistics center

KERN supplies protective fence for new logistics center

Europe’s leading online platform is building a new logistics center in Giessen, Germany, to strategically expand its European logistics network. The KERN Group was commissioned to plan and supply a protective fence system for this purpose. The specially...
Modernization parcel depot

Modernization parcel depot

DPD Deutschland GmbH has commissioned the KERN Group with the safety-related extension of a depot. In order to increase the safety of the employees during their daily work, an existing conveyor line was equipped with maintenance walkways on both sides. In addition,...
Successful commissioning of drive technology

Successful commissioning of drive technology

A large steel producer in Bremen has modernized the exit section of its galvanizing plant. KERN Industrie Automation was commissioned with the planning, delivery and installation of the power cabinets for the drive technology. After a short shutdown, the plant...