Together with the water technology division of PSE Engineering GmbH, KERN Industrie Automation is expanding the cooling water supply of a hot strip mill in Duisburg. The cooling water supply is being expanded to include an additional treatment circuit with 4 cooling towers and 18 gravel filter systems.
The scope of services includes engineering, delivery and installation of the complete power section from the 5KV switchgear to the installed drives, the plant and building lighting, as well as the installation of the new automation system with the PCS7 process control system from Siemens.
The project is currently in the final erection phase and is expected to be completed in the first quarter of 2025. This new project marks the continuation of a long-standing and successful collaboration between PSE Engineering and KERN Industrie Automation.